2024 - 2021 Airport Enhancement Projects
2024
-

Baynes Road Culvert Installation
-

Float Dock Upgrades
-

Perimeter Fencing Upgrades
-

Airport Road & Gate 1B Rehabilitation
-

Ford & Baynes Rd. Entrance
-

Apron 5 Fuel Card Lock Paving
-

Ops Shop Upgrades
-

BCAAP Perimeter Fencing
-

Apron 1 Safety Delineators Installed
-
Command Aviation Building Demo (Apron 3)
2023
-

BCCAP Taxiway Rehabilitation
-

BCCAP Runway 26L-08R Rehabilitation
-

Dyke Public Parking & Landscaping
-

Start of North/East Fill Site
-
Airport Way Fencing & Lights
-

Start of Apron 5 Aircraft Parking
-

Tri-M/Golden Arrow Building Demo (B220)
-

Cafe Demo (Portable)
-

Float Dock Rubberization
2022
-

YPK Plane Lift
-

YPK Park #2
-

Main Parking Lot Upgrade
-

EV Chargers
-

YPK Overflow Parking Lot
-

South Side Helipad Solar Lights
2021
-

Upgraded LED Airfield Lighting
-

Installation of New Back-Up Generator
-

YPK Tower Park